This action is part of the project for the renewal of the Circulation Remote Control System on ADIF’s Eastern Sub-directorate. This new project, which modernises the line and incorporates advanced technology, includes the installation of six latest-generation Quasar Q4e interlockings. The reform involves: incorporation of AV led signals, axle counters, motorised shims, renovation of the […]
Read More…
On February 22nd, 2021, the first QUASAR Q4 interlocking system was put into service at ADIF’s Vicálvaro Cargo Terminal (Madrid), after many years of work in its development and the investment effort it has entailed. It is an evolution and improvement of the S3e and positions CAF Signalling at the forefront of the signaling market […]
Read More…
Supply of ETCS L1/L2 Onboard equipment for the OARIS high speed train, able to run at a speed of 350km/h. Trains have a two-cab configuration, and comprise the integration with the Spanish ASFA national system. […]
Read More…
New Load Dispatch Office for remote control of the electric supply to the network, as well as the corporate communications system, with RTUs acting as the front-end normalizer of the protocol in all of the existing and future substations. The New Comprehensive Control Station in Alto del Arenal. […]
Read More…
Energy remote control which includes the remote control of the Substation and catenary network. The scope includes a Central Operation Station and the supply of a set of 50 RTUs however including others which already exist. […]
Read More…
Energy remote control which includes the remote control of the substation and catenary network. The scope includes a Central Operation Station and the supply of a set of 60 RTUs however including others which already exist. […]
Read More…
Energy remote control which includes the remote control of the substation and catenary network. The scope includes a Central Operation Station and the supply of a set of 70 RTUs however including others which already exist. […]
Read More…
Energy remote control which includes the remote control of the substation and catenary network. The scope includes a Central Operation Station and the supply of a set of 50 RTUs however including others which already exist. […]
Read More…